Passenger terminals Infrastructure of Singapore Changi Airport
1 passenger terminals
1.1 terminal 1
1.2 terminal 2
1.3 former budget terminal
1.4 jetquay cip terminal
1.5 terminal 3
1.6 terminal 4
1.7 terminal 5
passenger terminals
changi airport has 4 terminals, t1, t2, t3, , t4, total annual handling capacity of 80 million. terminals 1, 2, , 3 directly connected via monorail people mover system, airside passengers being able freely move between terminals without going through immigration. transport within , between these 3 terminals provided people movers , skytrain system, although possible walk between terminals on foot landside visitors.
a former budget terminal, capable of handling 7 million passenger per year, purpose-built low-cost carriers. physically separated main terminals towards south, connections possible via free shuttle bus service , terminal 2. demolition began in 2013 make way new , bigger terminal 4.
terminal 1
swimming pool in transit area of terminal 1.
singapore changi airport s oldest terminal operated sole terminal opening on 1 july 1981 right until opening of terminal 2 9 years later. configured in h-shaped layout maximise number of aerobridges may built, underwent 2 major upgrading works on lifespan. major refurbishment completed in 1995 @ cost of s$170 million , work extend 2 finger piers add 14 aerobridges @ cost of s$420 million took place 1996 1999. today, terminal spans area of 308,000 m² , can accommodate maximum passenger capacity of 21 million passengers year.
on 7 march 2012, minister of state transport josephine teo said open-air car park between terminal 1 , changi s iconic control tower redeveloped multi-use complex. new complex integrated existing building, , increase terminal 1 s public areas, pick-up driveways, , car park spaces. expansion, terminal 1 s handling capacity increase 21 24 million passengers per annum. expansion of terminal 1 go terminal 4.
as of 12 july 2012, $500 million facelift terminal 1 has been completed, completing terminal s largest renovation date, involving works on facade , halls under theme called tropical city . 22,000 m have been added building, bringing total floor space of t1 308,000 m. larger floor area provides more spatial comfort, better passenger flow, additional facilities , expanded retail , f&b offerings. refurbishment includes installation of two-part kinetic sculpture, kinetic rain, billed largest kinetic sculpture in world.
the southwest finger of level 3 of terminal 1 has head office of jetstar asia airways. scoot has head office inside terminal 1.
terminal 2
terminal 2 departure hall.
terminal 2 opened on 22 november 1990 part of phase ii in original airport masterplan. deploying linear configuration parallel runways, located adjacent terminal 1 towards south, , heralded opening of original skytrain system linking 2 terminals via landside. singapore airlines , silkair flights moved new terminal when opened, along several southeast asian carriers including malaysia airlines, philippine airlines, pal express, , royal brunei airlines. joined several airlines, of allied singapore airlines, in particular lufthansa, both fellow star alliance members. air france former user before moving terminal 1. other former users include air canada , austrian airlines, ceased operations changi in october 2006. etihad airways latest airline operate terminal 2 when commenced flights in september 2007. nippon airways moved terminal 2 1 october 2008. singapore airlines flights departing southeast asia, indian subcontinent, middle east , africa use terminal. airlines operating @ budget terminal, including tigerair, , cebu pacific, moved terminal 2 budget terminal closed site redevelopment.
the fourth storey of terminal houses civil aviation authority of singapore. in addition terminal 2 houses offices of air accident investigation bureau of singapore , changi airport group.
on 15 july 2013, airport unveiled latest themed garden has display of colours , interactive technology – first changi airport, has pioneered concept of airport gardens since opening in 1981. new enchanted garden – changi airport s fifth themed garden – takes pride in spot fern garden once stood. open, free of charge, passengers round-the-clock. motion sensors trigger sounds of nature , blooming flowers while fibre-optic , led lighting, embedded in flooring, form fascinating carpet of sparkling lights. there pond containing archerfish , koi.
former budget terminal
changi airport second in asia (after kuala lumpur international airport) open dedicated terminal catering budget traveller. name of budget terminal decided result of naming contest open public. however, terminal not included in numbering scheme, though third terminal opened when opened on 26 march 2006; , terminal 3 fifth terminal opened @ airport.
to offer lower landing fees, handling fees , airport taxes, cuts on amenities such aerobridges, elaborate physical structures , decorations in passenger terminal building. there no transfer facility @ budget terminal.
in september 2008, expansion works costing $10 million began , took 7 months complete. terminal able handle 7 million passengers year, 2.7 million. there more boarding gates, check-in counters, shops , dining options. in addition, air-conditioning has been installed arriving passengers.
on 2 march 2012, announced budget terminal closed on 25 september 2012 , demolished make way terminal 4. airlines operating budget terminal moved terminal 2, after last flight departed budget terminal @ 2 am on 25 september. construction of terminal 4 began in 2013, , completed in 2017. have capacity 16 million passengers per annum, previous 7 million of budget terminal, , not have aerobridges. promises have wider choice of retail , food , beverage offerings compared current budget terminal. terminal 4 designed enable efficient passenger processing , quick turnaround of aircraft. because once asean open skies agreement in place 2011, passenger traffic grow @ least 5 per cent each year.
on 25 september 2012, budget terminal officially closed doors public, airlines operations moved terminal 2 on same day
on 1 october 2012, demolition work budget terminal started , completed december 2012.
jetquay cip terminal
jetquay cip terminal, airport s fourth terminal, privately run terminal, located in between t2 , vip terminal. jetquay provides private check-in, baggage handling, , immigration clearance services. second luxury airport terminal in world open after lufthansa first class terminal in frankfurt airport. however, unlike lufthansa first class terminal, jetquay elite, dedicated cip (commercially important people) terminal can used passenger travelling in class, on airline, through terminal (t1, t2, t3, or t4).
terminal 3
transit area of terminal 3.
the butterfly garden in terminal 3.
shops line along transit area in terminal 3.
terminal 3, airport s fifth terminal, became operational on 9 january 2008, increasing airport s annual passenger capacity 22 million. test flight out of terminal 3 singapore airlines flight singapore perth. flight departed t3 @ 5:30 pm local time, landing in perth international airport @ approximately 11:30 pm. terminal has 28 aerobridge gates, 8 capable of handling airbus a380. while other 2 terminals use separate waiting areas different gates, terminal 3 has common waiting areas of gates.
designed cpg corporation, skidmore, owings , merrill designing roof feature , interior design woodhead, terminal 3 departs largely utilitarian architecture in first 2 terminals. other new airports in region, has structure made of glass, big transparent spaces inside terminal. however, unlike these newer airports, incorporates natural features , warm tone extensively balance sterile feel of glass , steel. example, column given wood-like cladding , floor of terminal cream/ beige colour. roof has been designed allow natural light enter building, 919 skylights. 5 m (16 ft)-high green wall hanging creepers , waterfall incorporated enhance tropical feel. green wall, designed singapore-based landscape design firm tierra design, helps regulate internal temperature of terminal occasional misting. interior architecture of terminal 3 won honour award asla.
singapore airlines operated first flights terminal 3 on 9 january 2008, flight sq001 san francisco via hong kong arriving @ 1150 hours welcome ceremony minister transport , second minister foreign affairs, lim siang keat raymond , chairman of cag, liew mun leong. first departure flight, sq318, took off @ 1250 hours bound london-heathrow. since then, regional , long-haul flights bound north/south america, europe, east asia , oceania depart new terminal while other flights depart terminal 2, becoming first , airline operate multiple terminals in changi airport.
china eastern airlines, jet airways, qatar airways , united airlines moved operations terminal on 1 january 2008, while kingfisher airlines launched services singapore using t3 in 2009. garuda indonesia, saudi arabian airlines, vietnam airlines , sri lankan airlines have moved operations t3 in 2011. in 2013, asiana airlines , lion air have moved operations t3. ethiopian airlines , spring airlines used operate terminal 3. on 2 july 2015, china airlines , eva air shifted operations t3.
terminal 4
changi airport terminal 4 opened on 31 october 2017. terminal replaced demolished budget terminal.
cathay pacific , korean air first 2 airlines move new terminal on 31 october 2017. followed cebu pacific , spring airlines on 2 november 2017. final 2 airlines move airasia group , vietnam airlines on 7 november 2017.
terminal 5
a fifth terminal, terminal 5, ready in next decade announced transport minister, lui tuck yew on 7 may 2013. terminal 5 built on 1,080 hectares of reclaimed land in changi east, making 1 of largest terminals in world. terminal handle capacity of 50 million passengers annually. addition of fifth terminal, changi airport able cater more 135 million passengers every year. national carrier @ terminal 5, each alliance of airlines such skyteam , oneworld operate out of dedicated terminals. terminal 5 expected have more self-service facilities , bigger lounges. terminal 5 linked other terminals @ changi airport. allow expanded changi airport operated single, integrated airport ease of transfer between different terminals, maximum passenger convenience , airfield operational efficiency.
in order create contiguous , integrated airfield, former changi coast road , park connector beside replaced new at-grade road , park connector further east, along eastern coastline, present tanah merah coast road. terminal may connected mrt network extension changi branch of east west line or thomson east coast line. more details released after engineering studies completed. adequacy of bus services airport reviewed. these plans ensure airport users , staff able travel airport , conveniently.
Comments